H.M.S. Reference and Research Materials
Searchable Database of Movements of H.M.S. Hood
Updated 07-Mar-2010

Use this page to search for details of where Hood was on any date or period. Detailed entries from the logs are only available for a certain months - mainly World War 2. Basic details about where the ship was are held for all of Hood's life from 1920 to 1941.

Chainbar divider




Transcription of the Log of H.M.S. Hood



Sunday 1st October 1939



From: Scapa
To: Loch Ewe
At: Scapa
Sick: Not recorded
Distance through water: -
Comments: -


00:00 - Altered course to 273°
01:58 - "Muriel" secured on "Plough".
06:15 - Work main derrick. Hoist out 2nd launch and shipped motor boat.
07:40 - "Effingham" sailed.
09:20 - Divisions and prayers.
09:45 - "Caledon" entered harbour.
10:00 - Church.
10:05 - Duty hands €˜On boat ropes'.
11:15 - "Delhi" entered harbour.
11:30 - Starboard Watch close up in 3rd degree of H.A. readiness.
11:40 - Fire parties exercised.
13:30 - Recreational leave to Starboard Watch 1330 to 1900.
15:00 - Oiler "Prestol" secured port side.
15:45 - Clear all decks.
16:00 - Canteen leave to Starboard Watch 1600 to 1900.
16:00 - Evening quarters. Canteen libertymen and patrol landed.
17:35 - Both Watches prepare for sea. Work main derrick.
18:12 - Oiler "Prestol" slipped.
20:00 - Port Watch work main derrick. Hoist barge and launch.
22:30 - Weighed
22:37 - Pointed
22:45 - Course as requisite for leaving harbour, speed 12 knots
23:12 - Passed gate
23:12 - Course 190°, speed 12 knots
23:14 - Speed 10 knots
23:16 - Streamed paravanes
23:20 - Cantick Head bearing 247°, Swona bearing 183°
23:24 - Altered course to 240°
23:26 - Speed 16 knots
23:27 - Cantick Head bearing 274°, Swona bearing 179°
23:39 - Altered course to 260°
23:58 - Stroma bearing 122°, Dunnet Head bearing 219°



Monday 2nd October 1939



From: Scapa
To: Loch Ewe
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


00:00 - Altered course to 273°
00:06 - Speed 17.5 knots
00:07 - Swona bearing 113.5°, Dunnet Head bearing 205.5°
00:10 - Commenced normal zig zag, speed 17.5 knots
00:20 - Tor Ness bearing 063°, Dunnet Head bearing 163°
00:30 - Rona Head bearing 015°, Dunnet Head Lighthouse bearing 137°
03:13 - Bulgie Island bearing 206°, Ben Juno bearing 171°, Fannard Head bearing 157°
03:50 - Altered course to 208°
04:00 - Commenced normal zig zag.
04:19 - Cape Wrath bearing 089°, Sth Ear Lighthouse bearing 182°
05:15 - Butt of Lewis bearing 285°, Tiumpan Head bearing 239°, Sth Ear bearing 148°
05:35 - Ceased zig zag.
05:45 - Altered course to 180°
05:48 - Tiumpan Head bearing 262°, Sth Ear Lighthouse bearing 103°
06:15 - Starboard Watch prepare in paravanes
06:30 - Rudh Re bearing 190°, Priest Island bearing 134°, Rhu Coigach bearing 083°
07:02 - Rudh Re bearing 208°, Greenstone Point bearing 109°, speed 12 knots
07:09 - Speed 10 knots
07:12 - In paravanes
07:25 - Speed 12 knots. Course as requisite for entering harbour
07:34 - Passed gate
07:50 - Stop
07:50 - Drifter "Leeward" secured alongside
07:55 - Came to port anchor in 23 fathoms (m. el) Veered to 8 shackles and secured
09:35 - Oiler "Boondale" arrived
11:55 - Oiler "Montenol" secured alongside
13:25 - "Montenol" slipped
14:15 - H.A. gunnery practices commenced
16:00 - Leave to Port Watch 1600 to 1900
16:20 - Libertymen and patrols landed
17:15 - Drifter "Bunhaven" secured alongside



Tuesday 3rd October 1939



From: -
To: -
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


06:15 - Hands fall in. Hoist out boats. Clean ship
06:30 - Pier cleaning party landed
07:55 - Quarters clean guns
08:00 - Landed R.M. training party and loof huts building party
08:58 - "Burnhaven" secured alongside
09:05 - Divisions. P.T. on quarterdeck. H.A. guns crews and control parties close up
09:35 - 15" control parties close up
11:25 - "Furious" and 8th Destroyer Flotilla entered harbour
11:45 - Exercised fire party
12:10 - Royal Marine landing party and canteen working party returned
13:05 - Shipwrights working party landed
13:15 - Both watches of hands fall in. Provided gear for €˜Tow Aft'
16:00 - Leave to Starboard Watch 1600 to 1900
18:30 - Loof huts working party returned on board
19:15 - Darken ship



Wednesday 4th October 1939



From: -
To: -
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


01:00 - H.A. guns crews of Port Watch close up
07:30 - Hands fall in scrub decks
08:10 - Royal Marines and loof hut building party landed
09:05 - Divisions. 4" H.A. guns crews and control parties close up
09:30 - Drifter "Leeward" secured alongside
10:40 - 15" gunlayers, turret director trainers and armoured director to "follow pointer" exercises
11:00 - Royal Marine working party returned on board
13:05 - "Leeward" slipped from port side
13:30 - Hoisted motor skiff
13:35 - "Burnhaven" secured alongside. 1 cot case discharged to Isle of Jersey on "Cassiopea"
16:00 - Leave to Port Watch 1600 to 1930
16:00 - Evening quarters
16:50 - "Foresight" entered harbour
17:30 - "Leeward" secured alongside
18:30 - Rig cinema. Darken ship



Thursday 5th October 1939



From: Loch Ewe
To: Scapa
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


08:00 - Royal Marine detachment landed
09:40 - Both watches employed cleaning ship
11:43 - work main derrick
12:00 - Royal Marine detachment returned
13:15 - Royal Marine football team landed. Both watches work main derrick
15:40 - Royal Marine football team returned on board
16:00 - Both watches of hands hoist boats. Prepare for sea
17:30 - Darken ship
17:45 - Cable party of Port Watch fall in on forecastle
17:50 - Special sea dutymen
18:14 - Weighed
18:23 - Pointed 300°
18:36 - Course and speed as requisite for leaving harbour
18:55 - 3rd degree L.A. and 4th degree H.A. readiness
18:57 - Passed gate
19:03 - Streamed paravanes. Course 338°, speed 10 knots
19:07 - Speed 14 knots
19:11 - Altered course to 006°
19:15 - Speed16 knots, An Araig bearing 165°, Ghenda bearing 133°, Greenstone Point bearing 057°
19:30 - Commenced Zig zag No. 15, speed 18 knots
19:35 - Glasleac Big ?? bearing 092.5°, 5'
20:00 - Course 006°, speed 14 knots. Negative zig zag
20:22 - Sth Ear Lighthouse bearing 069°
20:36 - Sth Ear Lighthouse bearing 092½ °. Altered course to 025°
21:00 - Sth Ear bearing 134°
21:31 - Sth Ear bearing 170½ °
21:35 - Sounded 50 fathoms decreasing
21:42 - Crossed 40 fathom line
21:50 - Sth Ear Lighthouse bearing 179½°
21:52 - Sounded 27 fathoms
22:45 - Altered course to 090°



Friday 6th October 1939



From: Loch Ewe
To: Scapa
At: Scapa
Sick: Not recorded
Distance through water: -
Comments: -


01:48 - Crossed 50 fathom line upwards
01:50 - Sighted Dunnet Head bearing 108°
02:08 - Dunnet Head Lighthouse bearing 115°
02:26 - Tor Ness Lighthouse bearing 081°, Dunnet Head bearing 129°
02:44 - Dunnet Head bearing 167°, Tor Ness bearing 063°
02:50 - Speed 10 knots
02:57 - Tor Ness bearing 016°, Cantick Head bearing 057°, Stroma bearing 117°
03:17 - Altered course to 050°
03:18 - Cantick bearing 027°, Stroma bearing 102°
03:24 - Swona bearing 125°, Stroma bearing 172°
03:50 - Passed gate. Course and speed as requisite for entering harbour
03:55 - In paravanes
04:18 - Stop
04:23 - Came to port anchor in 18 fathoms (sr) veered to 11 shackles and secured.
04:56 - Fall out special sea dutymen. Set anchor watch
06:00 - Starboard Watch prepare out booms and ladders
07:50 - 1st Port work main derrick
17:00 - Work main derrick. Hoist out barge and 1st picket boat.
19:00 - "Aurora" entered harbour
19:15 - 2nd Part Starboard work main derrick. Hoist 1st picket boat
23:00 - 2nd Part Starboard work main derrick. Hoist barge



Saturday 7th October 1939



From: -
To: -
At: Scapa
Sick: Not recorded
Distance through water: -
Comments: -


01:30 - Drifter secured astern
07:15 - Both watches clean ship, hoist our barge,1st picket boat and launch
07:55 - H.A. guns crews and control parties close up
08:50 - Special party from "Furious" arrived on board
09:00 - Special party from "Repulse" arrived on board
09:25 - Divisions
09:45 - His Majesty the King arrived on board
10:00 - His Majesty the King left ship
10:20 - "Repulse's" party left ship
10:40 - "Furious" party left ship
10:50 - Embarked 10 bags mail
11:05 - Discharged to H.M.H.S. "Aba", 1 rating
13:15 - Oiler "Micol" secured alongside
13:45 - Hands fall in by divisions on forecastle. Cheer ship.
14:00 - Leave to Starboard Watch 1400 to 1900
14:05 - "Aurora" with H.M. the King on board left harbour.
15:50 - Oiler "Micol" slipped and proceeded.
16:00 - Canteen leave to Starboard Watch 1600 to 1900
16:30 - "Warlight" secured alongside
16:50 - "Warlight" slipped
17:05 - Ammunitioning parties fall in.
17:10 - Lighter "Ardchatten" secured alongside
17:30 - Emergency party in provisions
17:50 - Duty part fall in on forecastle.
18:15 - 1st Part port work main derrick. Hoist barge.
18:20 - Lighter "Ardchatten" slipped and proceeded.
18:30 - Lighter C4 alongside with coke and M.V. oil
23:30 - Drifter secured astern.



Sunday 8th October 1939



From: Scapa
To: Sea
At: Scapa
Sick: Not recorded
Distance through water: -
Comments: -


02:30 - 2nd Part of Port prepare ship for sea. work main derrick. Hoist picket boat and oiling fender.
07:30 - Undarken ship
08:15 - Drifter "Sunny Bird" alongside with mail
09:00 - Roman Catholic church party to "Rodney"
09:20 - Divisions. March past Captain.
10:15 - Church in starboard battery
11:45 - Discharged to HMHS "Aba" 1 cot case and 1 ordinary case.
13:10 - Drifter "Sunny Bird" secured alongside
13:55 - 1st Starboard Prepare ship for sea
14:45 - Cable party of Starboard Watch muster on forecastle.
15:08 - Special sea dutymen to stations.
15:14 - Shortened in to 4 shackles.
15:30 - Weighed.
15:35 - Course and speed as requisite for leaving harbour.
16:04 - Passed gate.
16:06 - Course 165°, speed 10 knots
16:10 - Out paravanes
16:13 - Cantick Head bearing 255°, Swona N. Point bearing 182°
16:15 - Speed 15 knots
16:20 - Sea dutymen close up
16:25 - Speed 18 knots
16:27 - Lowther Rock bearing 137°, Swona S bearing 227°
16:35 - Altered course to 090°
16:46 - Altered course to 055°
16:55 - Speed 20 knots
17:00 - Brough Ness bearing 262°, Crumbs??? Ness bearing 322°
17:30 - Action stations
17:52 - Auskerry Lighthouse bearing 300°, Burgh Head bearing 319½°
17:57 - Altered course to 041°
18:00 - Pt 44.5'
18:48 - Fair Island bearing 010 €“ 014½°
19:08 - Fair Isle bearing 353½°, Fair Isle bearing 008°
19:15 - 4th degree H.A. and 3rd degree L.A.
19:50 - Fair Isle bearing 278°, Fair Isle bearing 292°
20:00 - Position: 59° 35'N 001° 07'W
20:00 - Hands to night action stations
21:52 - Altered course to 035°, speed 26 knots



Monday 9th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


01:00 - (Peak) 216.8'
05:15 - Alarm starboard
05:25 - Land 111 €“ 117
06:00 - Position: 63°00'N 004°03'E (observation)
06:32 - Altered course to 225°, speed 20 knots
07:00 - Assumed 3rd degree L.A. and 4th degree H.A. readiness.
07:00 - Commenced Zig zag No. 15, speed 22 ¾ knots
07:15 - (Point) 103½ , T.B. 103½, error nil
08:00 - Position: 62° 52'N 003° 36'E (star observation 0600)
09:00 - Both watches of hands fall in, negative hands closed up. Clean ship
09:57 - Aircraft sighted to port
10:00 - H.A. gunners crews close up.
10:10 - Position: 62°23'N 003°29'E (observation)
11:20 - Aircraft sighted right abreast
11:38 - C-in-C bearing 236°
11:55 - Altered course to 225°. Negative zig zag.
11:58 - Altered course to 280°
12:00 - Position: 61°57'N 001°31'E (1010 sun observation)
12:22 - Altered course to 295°
12:50 - 6' ahead of C-in-C. Reduce to 20 knots
13:20 - Position: 62°10'N, 000°47'E (observation)
13:22 - Aircraft sighted bearing 170°
17:03 - Altered course to 345° to change station on Flag
17:13 - Altered course to 335°
17:28 - Altered course to 295°
18:00 - Altered course to 300°
19:20 - Position: 63°08.5'N 002°52'W (observation)
19:30 - Night action stations
19:57 - Starboard Watch close up in 3rd degree of L.A. readiness.
20:00 - Position: 63°15'N 003°18'W (1920 star observation)
23:55 - Port Watch to 3rd degree of L.A. readiness



Tuesday 10th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


02:30 - Altered course to 260°
06:30 - Action stations
07:30 - Position: 64°07'N 011°18'W (observation)
07:30 - Assumed 3rd degree of readiness
07:45 - Undarken ship
08:00 - Position: 64°05'N 011°42'W (based on 0730 observation)
08:00 - Altered course to 080°
08:10 - Speed 14 knots
08:30 - (point) 106 2/3 , T.B. 106 2/3 Error €“ nil
10:10 - Altered course to 095°, speed 14½ knots
10:46 - Course 080°
10:49 - Course 120°
10:54 - Course 160°, speed 15 knots
11:05 - Course 170°, speed 18 knots to close "Nelson"
12:00 - Position: 63° 53'N 010° 04'W
12:24 - Altered course to 160°, speed 15½ knots
12:30 - Commence Zig zag No. 15
13:25 - Altered course to 160°. Negative zig zag.
13:30 - Speed 15 knots
16:43 - Altered course to 165° to take station astern of "Rodney"
16:44 - Speed 20 knots
17:26 - Speed 15 knots
18:00 - (Point) 248½ T.B. 248.3 Error €“ nil
18:35 - Altered course to 163°
19:30 - 62° 06'N 008° 42'W (observation)
19:30 - Night action stations
20:00 - Assumed 3rd degree of readiness
22:48 - Speed 12 knots. Hard east-southeasterly gale and sea.



Wednesday 11th October 1939



From: Sea
To: Loch Ewe
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


06:50 - Action stations
07:15 - Assumed 3rd degree of readiness
08:00 - Position: 59° 46'N 007° 20'W (estimated)
09:35 - Altered course to 140°
12:00 - Position: 59° 20'N 006° 56'W (estimated)
12:02 - Position: 59° 19'N 006° 67'W (sun observation)
12:33 - Speed 13 knots
12:46 - Speed 14 knots
13:30 - Position: 59° 03'N 006° 39'W (sun observation)
13:50 - Speed 15 knots
14:05 - Speed 16 knots
14:57 - Sighted Butt of Lewis bearing 192°
15:22 - Speed 17 knots
15:31 - Butt of Lewis Lighthouse bearing 325½°
15:36 - Altered course to 190°
15:55 - ?Sinleu? Lighthouse bearing 226°, speed 17 knots
16:30 - Speed 19 knots
16:40 - Ru Stoer bearing 119°, Sth Ear Lighthouse bearing 127°
16:54 - Sth Ear Lighthouse bearing 116, Ru Stoer bearing 104°
16:59 - Altered course to 187°
17:05 - Assumed 4th degree of readiness
17:32 - Rhu Coigach bearing 091°, Tauara Beg bearing 138°
17:48 - Speed 15 knots
17:54 - Altered course to 185° open order
18:02 - Speed 8 knots
18:08 - In paravanes. Course and speed as requisite for entering harbour (Loch Ewe)
18:55 - Passed gate
19:13 - Stop
19:18 - Came to port anchor in 23 fathoms (m. cl), veered to 8 shackles and secured
22:20 - Burnhaven secured alongside
23:00 - "Leeward" secured alongside



Thursday 12th October 1939



From: -
To: -
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


07:00 - Mr. B.H. Brown Bosun RN discharged from Hood
07:35 - 2nd Port work main derrick
07:45 - Oiler "Montenal" secured alongside
08:15 - Drifter "Leeward" secured alongside
08:20 - Recreation ground working party (1 & 12) landed
08:45 - Loof hut painting party returned
11:20 - Drifter €˜Hopeful' secured alongside
13:15 - Both Watches clean ship
13:30 - "Montenol" proceeded
13:40 - "Leeward" proceeded
14:44 - Air Raid Warning Yellow
14:55 - Air Raid Warning Red
15:05 - Air Raid Warning White
15:30 - Landed village and canteen patrol
16:00 - Leave to Port Watch 1600 to 1900
18:30 - Oiler "Birehol" secured alongside
18:30 - Darken ship
19:30 - work main derrick. Hoist launch, S.M.B.
22:00 - Prepare for sea
22:15 - Cable party fall in on forecastle



Friday 13th October 1939



From: -
To: -
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


06:00 - Starboard Watch work main derrick. Hoist out picket boat
07:35 - Quarters clean guns
08:00 - H.A. guns crews and control parties close up. Ship assumed anti-aircraft guard.
08:45 - Submarine "H-34" entered harbour
09:10 - Divisions. P.T. on quarterdeck.
10:25 - "Furious", "Fearless" and "Foxhound" entered harbour
11:20 - Clear lower deck €“ fortnightly payment
12:50 - Drifter "Shower" secured alongside with coaling party and canteen stores
14:30 - Stokers football teams (Port) landed
15:50 - H.A. guns crews secure
16:00 - Leave to Starboard Watch 1600 to 1830
16:00 - Ship relieved of anti-aircraft guard
16:00 - Evening quarters
16:10 - Cooks to P.T. on quarterdeck. Engine room evening quarters



Saturday 14th October 1939



From: -
To: -
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


01:00 - Northern lights showing vividly
07:35 - Both Watches clean ship. Hoist out 1st launch and 3rd cutter
08:00 - Guns crews and control parties close up
10:25 - Air Raid Warning €˜Yellow'
10:57 - Air Raid Warning €˜White'
13:30 - Leave to Port Watch 1330 to 1830
15:00 - Midshipman WLB Whittam RNVR and Midshipman BN Harris RNVR joined from London Division RNVR
15:00 - "Aurora" and "Belfast" entered harbour
16:20 - Starboard Watch close up in 3rd degree of HA readiness
16:30 - Torpedo working party (1+11) landed
18:05 - Air Raid Warning Yellow
18:15 - 2nd Starboard work main derrick
18:20 - Air Raid Warning Red
18:22 - Close X and Y doors
18:40 - 1st Part Starboard hoist boats



Sunday 15th October 1939



From: Loch Ewe
To: Sea
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


01:30 - H.A. guns crews and control parties of the Starboard Watch close up
07:35 - Quarters clean guns
07:50 - Both Watches work main derrick. Hoist out 1st launch
09:10 - Roman Catholic church party landed
09:20 - Divisions
10:20 - Church on the messdeck
11:05 - Unrig church
11:40 - Electrical fire party
13:00 - Provision party fall in on quarterderck. Duty hands fall in.
13:10 - Boarding party fall in.
14:30 - Port Watch work main derrick. Hoist S.M.B., P.B., 3rd cutter, barge and C.M.B
16:00 - Starboard Watch prepare for sea
16:25 - Special sea dutymen close up
16:41 - Shortened to 3 shackles
16:51 - Pointed
16:56 - Weighed
17:30 - Course and speed as requisite for leaving harbour
17:51 - Passed gate. Single line ahead
18:00 - Dropped paravanes
18:06 - Course 335°, speed 17 knots
18:13 - Altered course to 007°
18:20 - Commenced Zig zag No. 15
18:40 - Rhu Coigach bearing 064°, Craig on Col bearing 138°
18:50 - Sea dutymen close up
19:20 - Course 007°, speed 16 knots. Negative zig zag.
19:26 - Sth Ear Lighthouse bearing 079°, Tiumpan Head Lighthouse bearing 280°
19:36 - Altered course to 330°
20:00 - Position: 58° 20.6'N 005° 44'W (shore fix)
20:46 - Tiumpan Head Lighthouse bearing 204°, Butt of Lewis Lighthouse bearing 279°
20:54 - Altered course to 320° to avoid steamer
21:01 - Resumed course 330°
21:18 - Butt of Lewis Lighthouse bearing 222°



Monday 16th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


04:00 - Starboard Watch close up in 3rd degree of readiness
06:58 - Altered course to avoid trawler 310°
07:10 - Resumed course
07:15 - Position: 60° 52'N 008° 33'W (observation)
07:27 - Altered course to 075°
07:38 - Resumed course 330°
07:45 - Commenced Zig zag No. 15
07:45 - Action stations
07:48 - Speed 17 knots
08:00 - Position: 61°02'N 008°42'W (based on 0715 observation)
08:53 - Altered course to 345°
10:25 - Negative zig zag, speed 15 knots
11:00 - Speed 9 knots
11:05 - In paravanes
11:12 - Speed 15 knots
11:24 - Emergency altered course to 075°
11:31 - Resume course 345°
11:45 - Land bearing 065° (from foretop)
12:00 - Position: 62°00'N 009°05'W (sun observation)
12:25 - 1st Part Starboard close up in 4th degree of readiness. Remainder make and mend clothes.
14:08 - Position: 62°31'N 009°20'W
16:50 - Commenced 4" H.A. practice firing at target, smoke shell.
17:15 - Practice completed
17:32 - Altered course to 252°, speed 18 knots
17:38 - Altered course to 345°
17:45 - Speed 15 knots
18:30 - Altered course to 344°
19:00 - Position: 63°42'N 010°02'W (observation)
20:00 - Position: 63°56'N 010°12'W (observation 1900)
20:30 - Night action stations
20:39 - Altered course to 030°
20:47 - Altered course to 344°
21:01 - Assumed 3rd degree of readiness
22:05 - Altered course to 074°
22:15 - Speed 18 knots
22:28 - Altered course to 029°
22:40 - Action Stations
22:42 - Altered course to 344°
22:50 - Speed 16 knots
22:55 - Altered course to 343°
23:00 - Assumed 3rd degree of readiness



Tuesday 17th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


07:55 - Speed13 knots to drop back one mile
08:00 - Position: 66°55'N 011°56'W (estimated)
08:20 - Speed 16 knots
08:46 - Speed 12 knots
09:00 - "Fearless" approached ship to oil
09:30 - "Fearless" connected by springs and breasts
09:40 - "Fearless" back on tow
09:50 - Oiling hoses across
09:55 - Commenced pumping
10:30 - Crossed Arctic Circle. Oiling completed.
11:10 - Transferred cot case to "Hood" from "Fearless"
11:30 - nd Part Port close up in 4th degree of L.A. readiness
11:33 - Cast off oil hose
11:40 - "Fearless" slipped
12:00 - Springs across to "Punjabi"
12:00 - Position: 67°40'N 012°19'W (sun observation)
12:15 - Oil hose across
12:20 - Pumping
13:25 - Position: 67°57'N 012°28'W (observation)
14:00 - Ceased pumping
14:15 - Cast off tow
14:15 - "Furious" flying off aircraft.
14:19 - Altered course to 195°, speed 16 knots
14:26 - Speed 18 knots
14:38 - Altered course to 265°, speed 15 knots
14:40 - Speed 14 knots
14:57 - Altered course to 160°, speed 18 knots
15:05 - 3rd degree of readiness
15:07 - Altered course to 275°
15:25 - Commenced Zig zag No. 15
15:45 - Speed 14½ knots (speed of advance 13 knots)
16:10 - Altered course to 265°. Ceased zig zag.
16:15 - Commenced Zig zag No. 15
16:50 - Altered course to 005° and back to 295°
18:38 - Altered course to 190°, speed 18 knots. Contact starboard.
18:46 - Altered course to 265°, speed 16 knots
18:53 - Altered course to 270°
19:15 - Position: 67°52'N 015°32'W (observation)
19:30 - Night Action Stations
19:38 - Altered course to 265°, speed 13 knots
20:00 - Position: 67°51'N 016°00'W (based on 1915 observation)
20:05 - Starboard Watch close up in 3rd degree of readiness
23:26 - Altered course to 070°, speed 12 knots
23:55 - Port Watch close up in 3rd degree of readiness.



Wednesday 18th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


03:55 - Starboard Watch close up in 3rd degree L.A. readiness
07:55 - Port Watch close up in 4th degree of L.A. readiness
08:00 - Position: 68°26'N 013°48'W (observation)
08:26 - Altered course to 250°
08:53 - "Furious" flying off aircraft
09:10 - Commenced Zig zag No. 15 as from 0850, speed 14 knots
09:38 - (point) 120½ T.B. 121° Error ½° low
09:54 - Altered course to 330°, speed 17 knots. Investigating contact port
09:59 - Altered course to 220°
10:01 - Speed 14 knots
10:05 - Altered course to 250°. Continue zig zag
10:55 - Exercised stations for hit by torpedo
11:05 - Ceased zig zag
11:10 - Altered course to 220°
11:35 - Altered course to 350°, speed 18 knots. Investigating contact port
11:42 - Altered course to 220°
11:48 - Speed 17 knots
11:49 - Altered course to 175°
11:55 - Altered course to 210°
12:00 - Position: 68°11'N 015°10'W (sun observation)
12:13 - Altered course to 250°
12:20 - Commence Zig zag No. 15, speed 14 knots
12:30 - 2nd Part Starboard. Watch close up in 4th degree L.A. readiness
15:55 - 1st Part Port close up in 4th degree L.A. readiness
16:43 - (point) 222 T.B. 221 2/3 Error HIGH
17:00 - Ceased zig zag.
17:05 - ltered course to 270°, speed14 knots
17:20 - Warrant No. 106 read. Warrants 107 and 108 read
18:00 - Altered course to 250°
18:15 - Darken ship
18:20 - Altered course to 280°
18:30 - Altered course to 250°
18:35 - Altered course to 220°
18:45 - Altered course to 250°
18:48 - Negative zig zag, speed 12 knots
19:30 - Night action stations
20:00 - 67°39'N 019°23'W (estimated)
20:12 - Port Watch close up in 3rd degree of readiness
20:25 - Altered course to 070°
23:55 - Starboard Watch close up in 3rd degree of readiness



Thursday 19th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


03:55 - Port Watch close up in 3rd degree of readiness
07:55 - Starboard Watch close up in 3rd degree of readiness
08:00 - Position: 68°25'N 013°45'W (estimated)
08:20 - Altered course to 250°
08:50 - Course 240°
08:56 - Course 220°, speed 14 knots
09:30 - Altered course to 250° Commenced Zig zag No. 15 (as from 0900)
11:55 - 2nd Part Starboard close up in 4th degree of L.A. readiness
12:00 - Position: 68°08'N 015°24'W (sun observation)
12:30 - Emergency party prepare fog buoy
12:30 - Fog (on course 280°). Searchlight crew close up.
12:35 - Course 250°, speed 12 knots
12:45 - Destroyers astern clearing
13:30 - Altered course to 360°, speed 17 knots. Investigating contact.
13:36 - Altered course to 250°, speed 12 knots
14:25 - Streamed fog buoy at 256 fathoms
16:00 - Commence Zig zag No. 15, speed 16 knots
16:58 - (point) 225½ T.B. 224½ ERROR 1° high
17:33 - Negative zig zag. Altered course to 230° to increase distance from "Nelson"
17:35 - Speed 14 knots
17:54 - Altered course to 250°
17:59 - Course 120°
18:10 - Commenced Zig zag No. 15 €“ 15½ (m/g 13½ knots)
19:00 - Position: 67°39'N 017°57'W (observation)
19:10 - Ceased zig zag.
19:15 - Speed 13½ knots, course 120°
20:00 - Position: 67°33'N 017°23'W (based on 1900 observation)
20:00 - Starshell guns crews, control parties, pom poms crews and night lookouts close up.
20:35 - Night action stations
20:57 - Commenced night encounter exercise.
21:35 - Secure. Starboard Watch close up in 3rd degree L.A. readiness



Friday 20th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


03:55 - Starboard Watch close up in 3rd degree of readiness
05:05 - Arcturus 040½ T.B. 040½ Error Nil
05:12 - Altered course to 159°
07:55 - Port Watch close up in 3rd degree L.A. readiness
08:00 - Position: 65° 59'N 012° 18'W (estimated)
08:55 - 1st Part Port close up in 4th degree L.A. readiness
09:00 - Estimated m/g from 0500, speed 13.3 knots
09:30 - Increased 2 revs for weather €“ estimated m/g 13.4 knots
10:45 - Carried out rangefinding inclination exercise on "Foxhound"
11:10 - Altered course to 149° to avoid trawler (A83)
11:15 - Altered course to 159°
12:00 - Position: 65° 09'N 011° 32'W (estimated)
12:25 - Altered course to 205° "Aurora" 265° 2'
12:30 - 1st Part Starboard close up in 4th degree of readiness
12:40 - Estimated speed m/g 13 ¼ knots
15:30 - 82 revs (estimated speed m/g 12 knots)
15:55 - Port Watch close up in 3rd degree L.A. readiness
16:00 - 10 knots (70 revs)
16:25 - Sighted "Repulse" bearing 245°
16:35 - Speed 12½ knots
17:10 - "Repulse" in station astern. "Rodney" to join C-in-C
17:13 - Altered course to 225°
17:37 - 13 knots
18:00 - Altered course to 205°
18:07 - (point) 246 2.3 ° T.B. 246 1/3 Error ½° high
19:30 - Night Action Stations
20:00 - Position: 63°40'N 013°06'W (estimated)
20:12 - Port Watch close up in 3rd degree L.A. readiness
21:00 - Altered course to 180°
22:03 - ?? 2043/4° T.B. 204 3/4° Error nil
23:55 - Starboard Watch close up in 3rd degree L.A. readiness.



Saturday 21st October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


03:35 - Altered course to 148°
07:40 - Position: 61°20'N 011°53'W (observation)
07:55 - Starboard Watch close up in 3rd degree of L.A. readiness
08:00 - Position: 61°17'N 011°50'W (based on 0740 observation)
08:06 - Altered course to 168°
08:18 - Altered course to 148°
08:25 - Commence Zig zag No. 15 (as from 0800), speed 15 knots
09:15 - 18th Cruiser Squadron took station astern
09:18 - 1st Part Starboard close up in 4th degree L.A. readiness
09:42 - (point) 124° T.B. 124° Error nil
11:00 - For exercise, underwater damage abreast €˜Y' turret, port side
12:00 - Position: 60°32'N 010°54'W (estimated)
13:00 - Negative zig zag
13:05 - Altered course to 060°
13:10 - Speed 13 knots
13:35 - Speed 10 knots for paravanes
13:40 - Streamed paravanes
13:45 - Speed 13 knots
13:48 - Altered course to 090°
13:53 - Altered course to 148°
13:54 - Speed 15 knots
13:59 - Altered course to 158° (2° difference between No 1 and 2 compasses)
14:08 - Speed 12 knots
14:15 - Speed 13 knots
14:45 - Changed to No. 2 compass. No 1 wandering
15:55 - Starboard Watch close up in 3rd degree L.A. readiness
17:02 - Altered course to 124°
17:06 - Speed 11 knots
17:15 - Commence Zig zag No. 15
17:22 - Speed 13 knots
17:34 - Negative zig zag Altered course to 214°
17:44 - Altered course to 034°
17:55 - Altered course to 124°
18:05 - Zig zag No. 15, mean course 124°, speed 15 knots
18:40 - Position: 59°37.5'S(sic), 009°11.5'W (observation)
18:50 - Altered course to 124°
19:10 - Commenced Zig zag No 21, speed 16½ knots
19:30 - Night Action Stations
20:00 - Position: 59°27.5'N 008°44'W (based on 1840 observation)
20:10 - Starboard Watch close up in 3rd degree L.A. readiness
22:58 - 18 knots to openout from C-in-C
23:55 - Port Watch close up in 3rd degree L.A. readiness



Sunday 22nd October 1939



From: Sea
To: Loch Ewe
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


01:10 - Sighted Butt of Lewis Lighthouse bearing 136° - 23'
01:31 - 10½ knots (sp m/g 13 knots)
02:10 - Butt of Lewis Lighthouse bearing 158°
02:32 - Butt of Lewis Lighthouse bearing 202°
02:43 - Sighted Tiumpan Head Lighthouse bearing 183°, Butt of Lewis Lighthouse bearing 219°
02:53 - Speed 13 knots
03:03 - Butt of Lewis bearing 254°, Tiumpan Head Lighthouse bearing 193°
03:33 - Sth Ear Lighthouse bearing 130°, Butt of Lewis Lighthouse bearing 284°
03:55 - Starboard Watch close up in 3rd degree of L.A. readiness
04:05 - Speed 11½ knots, negative zig zag
04:25 - Altered course to 188°
04:27 - Tiumpan Head Lighthouse bearing 240 ½°, Sth Ear bearing 150½°
04:40 - Commenced Zig zag No 15
05:25 - Sth Ear abeam to port 8.0'
06:15 - Tiumpan Head Lighthouse bearing 299°, Sth Ear bearing 052°
06:55 - Negative zig zag
07:05 - Speed 10 knots
07:24 - Ploe of Slagger bearing 161°, Rhudh Re Lighthouse bearing 223°
07:28 - Special sea dutymen to stations
07:30 - Course and speed as requisite for entering harbour.
07:34 - In paravanes
07:50 - Passed nets
08:09 - Stop
08:14 - Came to starboard anchor in 23 fathoms, veered to 8 shackled and secured
08:45 - Drifter "Sunny Bird" alongside
09:35 - Roman Catholic church party to "Rodney"
10:10 - Drifter "Leeward" alongside
10:40 - Church in starboard battery
13:30 - "Inverarder" secured alongside
14:45 - "Hebe" and "Sharpshooter" entered harbour
15:25 - "Buccaneer" and "Bandit" entered harbour
15:45 - Mail arrived on board
16:50 - "Buccaneer" and "Bandit" secured port side
17:20 - Starboard Watch store ship
18:30 - Darken ship. 1st Part Starboard work main derrick. Hoist boats
21:45 - Oiler "Inverarder" proceeded
22:00 - Close €˜Y' doors
22:30 - "Firedrake" secured alongside, port side



Monday 23rd October 1939



From: Loch Ewe
To: Sea
At: Loch Ewe
Sick: Not recorded
Distance through water: -
Comments: -


07:30 - Mail party landed
07:35 - 2nd Part Port work main derrick. Hoist out boats
07:45 - H.A. control parties close up.
07:55 - H.A. guns crews close up.
08:00 - Provision Party to "Bellonia"
08:05 - Both watches of hands store ship
10:40 - 5.5" tops crew to drill
10:50 - Air Raid Warning Yellow
11:00 - €˜B' turret cabinet crew to drill
11:10 - Air Raid Warning White
13:15 - Both watches work main derrick, hoist boats, prepare for sea
15:30 - "Firedrake" proceeded
16:45 - Shortened in to 3 shackles
17:00 - Weighed
17:26 - Course and speed as requisite for leaving harbour
17:47 - Passed nets
17:51 - Out paravanes. Course 335°, speed 9 knots
17:55 - Sea dutymen close up
17:57 - Speed 15 knots
18:10 - Altered course to 007°
18:15 - 1st Port 4th degree of L.A. readiness
18:20 - Commenced Zig zag No. 15
18:58 - Tiumpan Head Lighthouse bearing 301°, Sth Ear bearing 046°
19:30 - Night action stations
19:40 - Altered course to 012°
20:00 - Position: 58° 20'N 05° 34.5'W (Shore fix)
20:09 - Sth Ear Lighthouse bearing 149°, Tiumpan Head Lighthouse bearing 251 ½°
20:21 - Tiumpan Head Lighthouse bearing 244°, Sth Ear Lighthouse bearing 154°
22:30 - Swung to 250° to avoid "Rodney" over running
22:35 - "Nelson" bearing 012°, speed 15 knots
22:50 - In station, commenced Zig zag No. 15
23:20 - Ceased zig zag.
23:30 - Altered course to 052, speed 16 knots
23:40 - Commenced Zig zag No. 21 (sp m.g. €“ 13 knots)



Tuesday 24th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


03:55 - Starboard Watch close up in 3rd degree L.A. readiness
05:25 - Course 052°
05:30 - Altered course to 027°
05:45 - Commenced Zig zag No. 21
07:15 - Position: 60°12'N 003°06'W (observation)
07:30 - Action stations
08:00 - Position: 60°18.5'N 002°47'W (based on 0715 observation)
08:07 - Port Watch close up in 3rd degree of readiness
08:10 - Ronas Hill bearing 072°, Stomboro Hill bearing 095°, Foula bearing 125°
09:20 - Ronas Hill bearing 097°, Foula bearing 152°
09:26 - (point) 129 ¼ T.B. 129° Error ¼ ° High
10:30 - Exercised abandon ship stations
10:44 - Ronas Hill bearing 129°
11:55 - Starboard Watch close up in 3rd degree L.A. readiness
12:00 - Position: 61°05'N 001°55'W (estimated)
13:55 - Altered course to 027°, 15 knots
14:00 - Commence Zig zag No. 15
14:12 - Sighted merchantman bearing 012°
14:21 - Negative zig zag , speed 13 knots
15:55 - Port Watch 3rd degree L.A. readiness
17:55 - Starboard Watch 3rd degree L.A. readiness
18:00 - Position: 62°14'N, 000°42'W (observation)
18:10 - Night action stations
19:55 - Port Watch 3rd degree L.A. readiness
20:00 - Position: 62°36.5'N 001°55'W (based on 1800 observation)
22:00 - Altered course to 040°
23:10 - Reduced to 12½ knots



Wednesday 25th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


03:55 - Port Watch close up in 3rd degree L.A. readiness
05:20 - Altered course to 060°
06:20 - Action stations
07:00 - Position: 64°08'N 002°59'W (observation)
07:20 - Altered course to 095°, speed 16 knots to take station 090° - 7' from "Nelson"
07:22 - Speed 17 knots
07:24 - Speed 18 knots. Altered course to 068°
07:34 - Port Watch Close up in 3rd degree of readiness
07:55 - Altered course to 065°
08:00 - Position: 64°13'N 003°30'E (based on 0700 observation)
08:20 - Speed 20 knots
08:28 - (point) 122 1/3° T.B. 122.1° Error €“ ¼ High
09:00 - Altered course to 060°, speed 15 knots
09:43 - Speed 18 knots
09:44 - Altered course to 068°
09:52 - Altered course to 067°
10:00 - Altered course to 066°
10:22 - Altered course to 065°
10:53 - Altered course to 043°, speed 12 knots
12:00 - Position: 64°41'N 005°38'E (estimated)
15:55 - Starboard Watch close up in 3rd degree L.A. readiness
16:50 - Altered course to 290° to take station on C-in-C
17:13 - Altered course to 270°
17:25 - Altered course to 043°
17:30 - Position: 65°29'N 007°01'E (observation)
18:00 - Altered course to 035°
18:16 - Port Watch close up in 3rd degree L.A. readiness
20:00 - Position: 65°51'N 007°45'E (based on 1730 observation)
23:55 - Port Watch close up in 3rd degree L.A. readiness



Thursday 26th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


06:00 - Sounded 100 fathoms
06:00 - Action stations
06:12 - Crossed 100 fathoms line
07:00 - Port watch to 3rd degree of L.A. readiness
07:12 - Position: 67°27'N 010°58'E (observation)
07:30 - Altered course to 285°
07:45 - Zig zag No 15, speed 13½ knots
08:00 - Position: 67°34'N 010°54'E (based on 0712)
08:00 - Negative zig zag. Course 255°
08:03 - Speed 14 knots
08:38 - Altered course to 285°, speed 12 knots. Thick snow storm.
10:11 - (point) 151° T.B. 152° Error 1° Low
10:55 - Exercise underwater damage, starboard side
11:38 - Altered course to 297°, speed 13 knots
11:55 - Starboard Watch close up in 3rd degree of readiness
12:00 - Position: 67°41'N 008°45'E (estimated)
13:20 - Altered course to 285°, speed 12 knots
14:44 - (point) 216° T.B. 216 2/3 ° Error 2/3 ° Low
15:55 - Port Watch close up in 3rd degree L.A. readiness
16:32 - Altered course to 315°, speed14 knots
17:00 - Position: 68°01.5'N 006°14'W (observation)
17:18 - Altered course to 285°, speed 12 knots
17:45 - Night action stations
18:15 - Starboard Watch close up in 3rd degree L.A. readiness
19:55 - Port Watch close up in 3rd degree L.A. readiness
20:00 - Position: 68°01.5'N 006°14'E (based on 1700 observation)
20:00 - Altered course to 205°
23:00 - Commence Zig zag No 15, speed 14 knots
23:55 - Starboard Watch close up in 3rd degree L.A. readiness



Friday 27th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


03:55 - Port Watch to 3rd degree L.A. readiness
06:30 - Action stations
07:15 - Port Watch close up in 3rd degree L.A. readiness
07:55 - Starboard. Watch close up in 3rd degree L.A. readiness
08:00 - Position: 66°01'N 002°00'E (estimated)
08:33 - (point) 122 1/3 T.B. 122° Error €“ Nil
09:00 - Prepare to get in paravanes
09:32 - Negative zig zag, speed 8 knots
09:35 - In paravanes
09:58 - Speed 14 knots
10:00 - Commence Zig zag No. 15
10:30 - Clear Lower Deck. Fortnightly payment.
11:55 - Port Watch close up in 3rd degree of readiness
12:00 - Position: 65°18'N 001°13'E (estimated)
13:00 - Negative zig zag.
13:05 - Commenced Zig zag No 21 (speed m/g 11 ¼ knots)
15:55 - Starboard Watch close up in 3rd degree L.A. readiness
17:00 - Altered course to 202°, speed 13 knots (Sp m/g €“ 10½ knots)
17:45 - Night action stations
18:25 - Port Watch close up in 3rd degree of readiness
19:55 - Starboard Watch close up in 3rd degree of readiness
20:00 - Position: 63° 56'N 000° 06'W (estimated)
23:55 - Port Watch close up in 3rd degree of readiness



Saturday 28th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


03:55 - Starboard Watch 3rd degree of L.A. readiness
06:45 - Action stations
07:20 - Starboard Watch close up in 3rd degree L.A. readiness
07:49 - Altered course to 360° to close "Nelson"
07:52 - Speed 14 knots
07:55 - Speed 18 knots
08:00 - Position: 62°04'N 001°47'W (estimated)
08:02 - Altered course to 340°
08:08 - Altered course to 310°
08:10 - Altered course to 295°
08:12 - Altered course to 285°
08:20 - Altered course to 265°
08:24 - Altered course to 205°, speed 16 knots
08:25 - Altered course to 202°, speed 13 knots
08:30 - In action astern of "Rodney"
08:31 - (Point 118½ T.B. 118½ Error Nil
08:46 - Altered course to 250°
08:51 - Altered course to 202°
10:12 - Altered course to 050°
10:30 - Zig zag No. 21 , speed 14½ knots
11:20 - Assumed 2nd degree of readiness
11:30 - Continued zig zag to starboard
11:45 - Port Watch to 3rd degree of L.A. readiness
12:00 - Position: 61°58'N, 001°40'W (estimated)
12:25 - Assumed 3rd Degree of H.A. Readiness
13:27 - Speed 12 knots
13:30 - Negative zig zag.
13:30 - Took station on line of bearing 240° from Flag
13:45 - "Nelson" commenced oiling Impulsive
15:25 - "Nelson" completed oiling Impulsive
15:30 - Formed astern
15:45 - 1st Part Port prepare to get out paravanes
15:55 - Assumed 4th degree L.A. readiness
17:00 - One 4" piasaba brush and 1 piasaba stove lost overboard
17:05 - Altered course to 217°
17:10 - Speed 9 knots
17:11 - Out paravanes
17:14 - Speed 14½ knots
17:43 - Emergency altered course to 270°. Explosions port side
17:50 - Resume course 217°
17:53 - Explosions port side. "Icarus" depth charges
18:00 - Night action stations
18:35 - Assumed 3rd degree of readiness
18:45 - Zig zag No. 15, speed 16 knots (sp m/g 14.1)
20:00 - Position: 62°04'N, 000°53'W (estimated)



Sunday 29th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


03:55 - Port Watch close up in 3rd degree L.A. readiness
07:00 - Night action stations
07:30 - Assumed 3rd degree of readiness
07:45 - Position: 59°55'N 004°20'W (observation)
08:00 - Position: 59°51.5'N 004°22'W (based on 0745 observation)
08:20 - Negative zig zag.
08:25 - Altered course to 270°
08:35 - Altered course to 360°
09:00 - Commence Zig zag No.15
09:10 - Assumed 3rd degree H.A. and 4th degree L.A. readiness
09:49 - Formed on a line of bearing 195° from C-inC
10:00 - In station
10:15 - Both watches fall in for prayers in port battery
10:35 - Assumed 4th degree of H.A. readiness
12:00 - Position: 60°32'N 004°40'W (estimated)
13:20 - Altered course to 020°. Negative zig zag.
13:29 - Altered course to 000°
13:30 - Commence Zig zag No. 15
14:30 - Negative zig zag.
14:35 - Altered course to 030°
14:39 - Altered course to 000°
14:45 - Commence Zig zag No.15
17:45 - H.A. armament secure
18:00 - Night action stations
18:15 - Negative zig zag.
18:20 - Speed 14½ knots
18:27 - Assumed 3rd degree of readiness
18:39 - Formed astern of C-in-C
20:00 - Position: 62°24'N 004°40'W (estimated)
20:05 - Altered course to 186°
20:38 - Altered course to 095°
21:21 - Altered course to 185°
21:30 - Commence Zig zag No. 21 (to Port), speed 18 knots



Monday 30th October 1939



From: -
To: -
At: Sea
Sick: Not recorded
Distance through water: -
Comments: -


00:00 - Untimed Note €“ "Had occasion to admonish Sub Lieutenant Douglas Collier Salter Royal Navy for neglect of duty as star shell control officer." Signed DC Salter Sub Lieutenant
01:35 - Raise steam for full speed
05:00 - Altered course to 220°
05:09 - Altered course to 185°
05:20 - Commenced Zig zag No. 21
06:00 - Night action stations
07:15 - Assumed 3rd degree L.A. readiness
08:00 - Position: 59°41'N 005°01'W (estimated)
08:11 - Negative zig zag.
08:20 - Altered course to 235°
08:30 - Commenced Zig zag No. 15
09:39 - (point) 130° T.B. 130° Error Nil
10:00 - Negative zig zag. Sighted Rona bearing 215½°, 220
10:05 - Altered course to 190°
10:10 - Commenced Zig zag No. 15
10:20 - (point) 138½ T.B. 138½ Error ¼ Low
10:45 - Speed 17 knots, Rona bearing 306°, Sulisher bearing 272°
11:00 - Exercise Underwater Damage
11:15 - Sulisher bearing 300°, Rona bearing 342°
12:00 - Position: 58°45.4'N 005°51.5'W (shore fix)
12:45 - Tolsta Head bearing 211½°, Butt of Lewis Lighthouse bearing 249°
13:15 - Tolsta Head bearing 225°, Butt of Lewis Lighthouse bearing 282°.
14:45 - Chicken Head bearing 302°, Tiumpan Head Lighthouse bearing 340°.
15:41 - Shiant Island bearing 292°, Eilean Trodday bearing 210°, Negative zig zag.
15:59 - Altered course to 245°
16:17 - Eilean Trodday Lighthouse abeam to port 1'.0
16:55 - (point) 234, T.B. 234° Error Nil
17:00 - Negative zig zag.
17:20 - Altered course to 194°
17:30 - Commenced Zig zag No. 15 starboard Leg
18:02 - Vaternish Lighthouse bearing 043°, Niest Point Lighthouse bearing 129°
19:35 - Speed 18 knots
19:55 - Starboard Lifebuoy released in error. Not recovered.
20:00 - Position: 56°59.5'N 007°07'W (Shore Fix)
20:55 - Altered course to 200° to avoid €˜C' Class cruiser
21:05 - Altered course to 194°
21:12 - Barra Head Lighthouse bearing 295°, Ben Eaval bearing 340°
21:15 - Commenced Zig zag No. 15
21:50 - Ben Hough bearing 092½°, Skerryvore bearing 142°, Negative zig zag.
22:07 - Altered course to 158°
22:12 - Skerryvore Lighthouse bearing 118°, Ben Hough bearing 069°
22:15 - Commenced Zig zag No. 15



Tuesday 31st October 1939



From: Sea
To: Greenock
At: Greenock
Sick: Not recorded
Distance through water: -
Comments: -


01:03 - Oversay Lighthouse bearing 094°, Inishtrahull Lighthouse bearing 216°
01:10 - Passed H.M.S. "Scotstoun"
01:37 - Altered course to 110°
02:44 - Bull Point Lighthouse bearing 146°, Altacarry Lighthouse bearing 175°
03:15 - Altered course to 143°
03:19 - Mull of Kintyre Lighthouse bearing 110°, Rue Point Lighthouse bearing 220°
04:07 - Altacarry Lighthouse bearing 296°, Mull Lighthouse bearing 014°, Sanda Lighthouse bearing 065°
04:22 - Altered course to 060°
05:55 - Arran bearing 315°, Ailsa Craig Lighthouse bearing 169°
06:17 - Altered course to 359°
06:21 - Pladda Lighthouse bearing 260°, Holy Island Lighthouse bearing 327°
06:30 - Prepared for entering harbour
06:43 - Altered course to 356°
07:00 - Speed15 knots
07:20 - Cumbrae Lighthouse to starboard, 9 cables
07:39 - Great Cumbrae to starboard.
07:48 - Speed 12 knots
07:52 - Speed 9 knots
07:55 - Toward Point Lighthouse to port
08:00 - In paravanes. Special sea dutymen
08:00 - Position: 55°52'N 004°57'W (shore fix)
08:10 - Altered course to 020°
08:26 - Passed Gate. Course and speed as requisite for entering harbour (Greenock).
08:53 - Stop
08:59 - Came to port anchor in 19 fathoms, veered to 8 shackled and secured
09:30 - Both watches clean ship
10:00 - "Birelol" secured alongside
10:05 - P.D. 202 secured alongside
11:00 - "Madenol" secured alongside
13:00 - Libertymen landed
13:15 - Hands fall in. Wash ship's side
16:15 - Joined, 2 ratings
16:30 - Provision party landed
17:00 - Signal ratings for shore signal station landed.
17:50 - Darken ship
18:40 - Duty hands fall in
19:30 - Work main derrick. Hoist boats.
20:25 - Duty hands embark provisions €“ 8,000 lbs meat, 1 ton vegetables
20:35 - 1st Part Port store ship
22:25 - 2nd Port work main derrick. Hoist 2nd picket boat